Contractor Safety
Contractor Safety
The Ãâ·Ñ¸£Àû×ÊÔ´ÔÚÏß¿´Æ¬ of Lethbridge CONTRACTOR SAFETY STANDARD defines responsibilities and procedures that must be followed when contractors,suppliers and service providers are hired to conduct work for the Ãâ·Ñ¸£Àû×ÊÔ´ÔÚÏß¿´Æ¬.
All contractors are required to meet or exceed the Alberta Occupational Health & Safety Act, Regulation and Code, and conduct their activities in accordance with the applicable Ãâ·Ñ¸£Àû×ÊÔ´ÔÚÏß¿´Æ¬'s policies and procedures.
For work involving a U of L building or facility system:
- Requires notification and approval by the Facilities department. This includes any installation of new equipment, renovation or alteration of existing facilities/ equipment, or interface with building systems, etc.
- Contact Facilities PRIOR to hiring a contractor or service provider.
For work involving contractors or service providers (e.g. equipment repair personnel):
- Ãâ·Ñ¸£Àû×ÊÔ´ÔÚÏß¿´Æ¬ employees that hire contractors and service providers are responsible for ensuring compliance with regulatory requirements and applicable Ãâ·Ñ¸£Àû×ÊÔ´ÔÚÏß¿´Æ¬ procedures. Contractor pre-qualification may also be required.
- Contact Safety Services for advice and assistance PRIOR to hiring a contractor or service provider.
Ãâ·Ñ¸£Àû×ÊÔ´ÔÚÏß¿´Æ¬ policies, occupational health & safety regulatory requirements and Ãâ·Ñ¸£Àû×ÊÔ´ÔÚÏß¿´Æ¬ insurance requirements apply. This includes the following:
The Ãâ·Ñ¸£Àû×ÊÔ´ÔÚÏß¿´Æ¬ of Lethbridge uses safety prequalification as a method to develop and maintain a list of preferred Contractors who meet the minimum safety standards to be considered for completing work at the Ãâ·Ñ¸£Àû×ÊÔ´ÔÚÏß¿´Æ¬. Contractor Safety Pre-qualification forms are provided below.
COR/SECOR Certified Contractors:
- The validity period for preferred contractor prequalification is three (3) years.
- The first year, a Full HSE Prequalification Application is required.
- An Interim Review Application will be required in the second and third year.
Contractors who are not COR/SECOR Certified:
- A Full HSE Prequalification Application is required annually.
The Ãâ·Ñ¸£Àû×ÊÔ´ÔÚÏß¿´Æ¬ of Lethbridge, may, at any time during the prequalification period, re-evaluate or request further information from the prime contractor, to maintain ‘prequalified’ status.
- Following the three (3) year period, prequalified prime contractors will be required to submit a Full HSE Prequalification Application.
- Upon approval of safety prequalification by Campus Safety, additional information may be required by specific Ãâ·Ñ¸£Àû×ÊÔ´ÔÚÏß¿´Æ¬ Departments to verify contractor’s capacity, skill and experience in other areas (e.g. commercial, environmental, and technical).
- It is the contractor’s responsibility to contact the specific Department to ensure any other required information is completed.
Application forms for Food Services Contractors are provided below: